Tuesday 3 November 2026 Calendar Track record Research
United Kingdom · General election · 1950not used by the model

The final polls missed by 2.1 points a party. Labour was understated most, by 3.0.

3 final polls from 3 pollsters, each firm's last before polling day, against the official result. This election is before 2000, so the forecast does not learn from it.

United Kingdom, 1950: the 3 final polls missed each party by 2.1 points on average. The biggest miss was Lab, -3.0 points; the closest pollster was Gallup.

2.11
Poll average: average miss per party
3 parties at 5%+; all 3 measured: 2.11
2.11
A typical single poll
points a party, same parties
−3.0
Biggest miss: Lab
polls 43.8, result 46.8
Gallup
Closest to the result
1.17 points a party; furthest: Daily Mail (own poll) 3.17

Each final poll against the result

The line is the result. Each dot is one pollster's final poll, placed by how far it was from the result; the ring is the poll average. Right of the line, the polls had the party too high.

← too lowtoo high →polls / result
Lab
Daily Express (own poll): 44.0 (−2.8) Daily Mail (own poll): 42.5 (−4.3) Gallup: 45.0 (−1.8) Average: 43.8 (−3.0)
−3.043.8 / 46.8
Con
Daily Express (own poll): 44.5 (+1.5) Daily Mail (own poll): 45.5 (+2.5) Gallup: 43.5 (+0.5) Average: 44.5 (+1.5)
+1.544.5 / 43.0
Lib Dem
Daily Express (own poll): 11.0 (+1.7) Daily Mail (own poll): 12.0 (+2.7) Gallup: 10.5 (+1.2) Average: 11.2 (+1.9)
+1.911.2 / 9.3
resultone pollster's final pollaverage of the final polls

The poll average against the result

PartyResultPoll averageMissLowest–highest pollPolls
Lab 46.8 43.8 −3.0 42.5–45.0 3
Con 43.0 44.5 +1.5 43.5–45.5 3
Lib Dem 9.3 11.2 +1.9 10.5–12.0 3

Each pollster's final poll

Closest first. Under each figure, the miss: + too high, − too low.

Pollster Lab Con Lib Dem Avg miss
Gallup 20 Feb 1950 45.0−1.8 43.5+0.5 10.5+1.2 1.17
Daily Express (own poll) 21 Feb 1950 44.0−2.8 44.5+1.5 11.0+1.7 2.00
Daily Mail (own poll) 11 Feb 1950 42.5−4.3 45.5+2.5 12.0+2.7 3.17
Average of the final polls 43.8−3.0 44.5+1.5 11.2+1.9 2.11
Result 46.8 43.0 9.3

How this is measured